Research and Test Plan


 Rated power operation of the HTTR started in FY2002 to accumulate long-term operation data. Safety demonstration tests started in March 2002 to show inherent safety features of the HTGRs and to establish new consideration for safety design and evaluation methods.JAEA plans to demonstrate the production of hydrogen by high temperature gas supplied by the HTTR, which would contribute to the development of future energy strategies.



前へ戻る ホームへ戻る